PTE Reading
Re-order Paragraphs
1 questions. Answer them all, then submit once for your section score.
1 of 1Time Remaining00:06:00
1.
Re-order Paragraphs
Arrange the sentences into the correct order.
Put the sentences in the correct order:
- The finished structure can flex slightly in wind and traffic loads without damage, which is precisely why it suits such a long, unsupported span.
- Smaller vertical cables are then hung from the main cables at regular intervals to support the deck as it is built outward from each tower.
- Construction begins with anchoring these main cables deep into concrete blocks on each bank, capable of withstanding enormous tension.
- This design relies on massive cables strung between two tall towers to hold up the roadway rather than a series of piers in the water.
- When engineers must cross a wide river without obstructing the shipping lanes below, they often turn to the suspension bridge design.